Technical consulting services in relation to the use of thermal solar energy for the air conditioning of the EMSA office building
It is intended to install a thermal solar system that would support the existing installations both in the production of cold and hot water to be used for the existing HVAC in order to reduce the consumption of primary electrical energy. The contractor shall prepare in phase I :
1. evaluation of the existing HVAC system and the related energy consumption patterns;
2. evaluation of the best technical and economical feasible solution to support the operation of the HVAC system and to reduce the consumption of electrical energy. The solar energy shall be used to support both the heating and the cooling function of the existing HVAC, the latter possibly through absorption technology;
3. evaluation of the feasibility to reuse thermal energy produced by operation of the Agency IT servers to support the reduction of electrical energy consumption of the HVAC.
Following the acceptance of the evaluation report of phase I the contractor shall draft the detailed technical specifications and the terms of reference based on which the Agency shall be in a position to procure the necessary equipment and the installation of such equipment.
Prazo de entrega
O prazo para a recepção das propostas era 2012-09-17.
O concurso foi publicado em 2012-07-18.
Fornecedores
Os seguintes fornecedores são mencionados nas decisões de adjudicação ou noutros documentos de contratação:
Quem?
O quê?
Histórico de aquisições
Data |
Documento |
2012-07-18
|
Anúncio de concurso
|
2012-12-14
|
Anúncio de adjudicação
|